Line dragon pump hose dragger concrete placer system.
Line dragon concrete pump.
Line dragon concrete placement systems.
Keim concrete pumping s line dragon placement system consists of 2 radio controlled units that are used to pull or drag the concrete hose around on the jobsite in place of manual laboring.
Each unit weighs only about 1200 pounds and will easily maneuver over rebar radiant heat lines nelson studs floor decking and other prepared surfaces.
These units are powered by 13 horsepower gas engines and work in tandem to increase production up to 60 and reduce labor cost and injuries.
Line dragon llc the updated remote controlled line dragon concrete placing system increases safety and reduces labor costs by replacing the need for workers to drag and manipulate the concrete.
Besides being the most nimble concrete placing machine on the market this concrete hose pulling machine is sure to enhance productivity create labor savings and reduce the risk of injury associated with moving concrete pump hoses by hand.
The line dragon machines weighing about 410 kg and 450 kg are driven on wide rubber filled tires which minimize the evenly spread weight per cm 2.
Featuring remote controlled hose handlers the sp 16 line pulling and placing system is equipped with powerful engines in addition to load sensing and variable displacement hydraulics that move lines with ease.
Ft hour and are a must if you are uilizing a 4 concrete hose.
Our concrete pumping equipment features putzmeister boom pump trucks and a line dragon pump hose dragger and concrete placer system.
Line dragon the dragon egg.
Mccoy indianapolis line dragon pour.
Introducing the next generation the somero line dragon line pulling and placing system.
In january of 2019 somero acquired line dragon and the synergies from this acquisition have resulted in the industry s most advanced placer and puller machine.
The dragon egg is placed around the concrete pump hose clamp to prevent the clamp from catching on the rebar or wire mesh.
The placer is attached to the end of the delivery line hose and places concrete where you need it while the dragger is placed 6 12 meters before the placer keeping the excess line out of the pouring area.